
Part 1: DVM Basics
Key points:
- Schematic needs a DVM control symbol to run DVM
- Testplans: tab delimited text, open in excel
- Header row identified by: *?@
- Preface curve names with "DVM" to include in report
- Measurements automatically made on "DVM" curves